Fall build 2020 Site prep The fall season begins with a green build on a beautiful homesite in the western suburbs. First day consists of

GreenImage Showpiece The “Dream” begins Cleared trees become the fencing to border the future fescue covered fairway. Cleared turf and stumps to prepare site for

Summer build 2020 Digging begins The summer begins with a beautiful lakeside build near Faribault, MN. We begin by marking green location and removing organic

Spring build 2020 Turf removal First day begins edging outline of complex and removing turf. Used portion of material to fill and mound low area

Fall Build Week 1 Cleared trees, excavated stumps, removed brush and grass, marked green site and began excavating. Installed drainage, laid out geotextile fabric and