Blog

Fall build 2020

Fall build 2020 Site prep The fall season begins with a green build on a beautiful homesite in the western suburbs.  First day consists of

Read More »

Showpiece begins 2020

GreenImage Showpiece The “Dream” begins Cleared trees become the fencing to border the future fescue covered fairway.  Cleared turf and stumps to prepare site for

Read More »

Summer build 2020

Summer build 2020 Digging begins The summer begins with a beautiful lakeside build near Faribault, MN.  We begin by marking green location and removing organic

Read More »

Spring build 2020

Spring build 2020 Turf removal First day begins edging outline of complex and removing turf.  Used portion of material to fill and mound low area

Read More »

Fall Build 2019

Fall Build Week 1 Cleared trees, excavated stumps, removed brush and grass, marked green site and began excavating. Installed drainage, laid out geotextile fabric and

Read More »

Free Consultation