Summer build 2020

Digging begins

The summer begins with a beautiful lakeside build near Faribault, MN.  We begin by marking green location and removing organic material.  Aggregate arrives.

Green complex is dug out and shaped.  We install outside border drain tile and begin adding aggregate to shape green.

Drain tile & aggregate

Tees & turf

Install padding on green to prepare for turf install.  Build tee box on hill looking down on green and one tee box lakeside.

Synthetic green and fringe turf installed.  This green has a two tier design creating a backstop for front pin locations and challenging approach shots to the back pin locations.  Two tiers allow for straighter putts on both levels while opening your imagination with its slope from top to bottom. .  

Ready for play