GreenImage Showpiece

The "Dream" begins

Cleared trees become the fencing to border the future fescue covered fairway.  Cleared turf and stumps to prepare site for build.  

Dirt is moved and shaped to form mounding on backside of green complex.  Begin to mark, dig and shape back bunker locations. 

Building mounds

Bunkers Begin

Dug trenches for drain tile in bunkers.  Installed poly and drain tile in bunker floors.  Began to stack synthetic turf walls to begin shaping revetted (stacked sod) bunkers. 

Built a bridge over creek from repurposed fence gates and posts.  Completed decking with treated lumber.  Cart path will be installed to cross the bridge allowing future clients easy access from tees to green to experience our GreenImage Golfscape.

Bridge to the future

Bunker walls complete

 

 

 

 

Completed creating revetted bunker walls.  The green side walls of back bunkers and all walls of front right bunker are layered with synthetic turf and sand.  This process creates a stacked sod look using synthetic turf.  Fescue sod is installed on the back face of rear bunkers.  The mounding is seeded with fescue.